AMERICAN SHEET EXTRUSION
Evansville, IndianaPlastics Manufacturer Increases Reliability and Energy Efficiency Through Performance Contracting Partnership
THE OPPORTUNITY
American Sheet Extrusion needed to improve the quality and consistency of electricity at its Evansville facility, reduce demand-based energy costs, and enhance production quality control without disrupting manufacturing systems and using the energy savings to fund the enhancements.
THE RESULTS
After comprehensive facility and operation analysis, Energy Systems Group designed and installed a custom energy efficiency program and strategy that significantly increased electric reliability, reduced energy consumption and improved operations efficiency without impacting any existing budgets. This $300,000 partnership benefits American Sheet’s facility and operation through:
- Reduced Operating Costs by Compressed Air Retrofit & Storage Application
- Increased Energy Reliability While Reducing Costs Via Power Factor Correction
- Improved Lighting to Enhance Operation and Facility Environment
- Guaranteed Energy Savings to Pay for the Program
As an added benefit, ESG was able to enhance American Sheet’s manufacturing process by:
- Utilizing ESG’s In-Depth Analysis to Install Extrusion Heat Blankets that Reduce Energy Consumption and Increase Manufacturing Process Quality Through Tightly Controlled Extruder Barrel Temperatures

PARTNERSHIP HIGHLIGHTS
Services provided by Energy Systems Group to American Sheet Extrusion:
Financing and Bonding Package
Engineering, Development and Design
Measurement and Verification Services
Guaranteed Energy Savings
Turnkey Implementation
Strategic Energy Master Planning ™
Alternate Energy Rate Analysis & Savings Achievement
Manufacturing
- Installation of extruder heat blankets to increase product quality
- Extrusion equipment temperature control improvements
- Compressed air system enhancements to include storage application
- Installed control and automation system
- Improved facility environment through unit upgrades
- Installed power factor correction equipment for enhanced reliability and peak energy reduction
- Upgraded electrical distribution
- New insulation throughout facility to reduce energy consumption
- Upgrade lighting throughout facility