Naval Aviation Depot Uses Energy Conservation To Improve Infrastructure and Process Quality

THE OPPORTUNITY
Marine Corps Air Station Cherry Point Naval Aviation Depot (NADEP) provides the nation with the highest quality of depot-level maintenance, engineering and logistics support for Marine Corps aviation. NADEP needed an innovative partner and a solution to replace a conventional and inefficient paint booth system with improved technology that would reduce energy costs, reduce operation costs, increase production rates and fit seamlessly into the existing production schedule.

THE RESULTS
Energy Systems Group provided a turnkey project to design and build a state of the art infrared oven, conveyor, and paint booth system that reduced energy costs by 35% in the paint process. Additionally this innovative technology application is able to automatically adjust the oven’s coverage for the size and mass of parts and is able to provide precise temperature control and drying times to increase quality, speed and efficiency for the paint processes. This $700,000 partnership benefits NADEP through:

  • Reduced Energy and Operation Costs to Fund the Existing Mission
  • New Equipment and Infrastructure to Maximize Facility Capacity
  • Increased Control and Reduced Costs of Energy At The NADEP Paint Facility

The innovative design included some of the following elements:

  • Advanced technology infrared oven for improved performance
  • Counter rotating ring monorail conveyor system simplifying paint process
  • Control system improvements to optimize safety and processing flexibility
  • Enhanced exhaust fans, ductwork, and fire protection for increased worker safety

PARTNERSHIP HIGHLIGHTS

Services provided by Energy Systems Group to Cherry Point Marine Corps Air Station NADEP:
Comprehensive Energy Audits and Savings analysis
Design of all components including mechanical, electrical, structural, controls and instrumentation
Construction
Start up and adjustment services
Training

Key Installed Technologies included at Cherry Point Marine Corps Air Station NADEP:
Infra-red oven saving 35% energy cost
Electronic energy controllers: variable frequency drives, timers, etc.
Improved, more manageable filtration and environmental monitoring
Superior monorail conveyor systems
Wet pipe fire protection system
Energy and Operational Savings over 35%