Energy Systems Group, LLC (ESG) was hired to engineer, design and install new piping to all the main campus facilities that will provide hot water for heating and chilled water for cooling.  This distribution piping will connect the newly renovated James B. Shepherd Central Utility Plant to the majority of the main campus buildings. This new piping is another major step in providing reliable and efficient heating and cooling to all the major buildings on the CAU campus.  This first phase of the piping will connect several major on the main campus and has been designed for the future connection of all the major buildings on the CAU Campus.  This forward thinking by Clark Atlanta University is another major step in providing and planning for a better, safer and modern campus.


Base Project Buildings
Immediate
Sage Hall 
Chilled and Hot Water 
Trevor Arnett
Chilled and Hot Water
Clement Hal
Chilled and Hot Water
Wright Hall
Chilled and Hot Water
Merner Hall
Chilled and Hot Water 
Holmes Hall
Chilled and Hot Water 
Pfeiffer Hall
Chilled and Hot Water 
 

Construction Overview
 
The construction of the Distribution Pipe will be starting in November of 2007 with major trenching by Holmes, Merner and Pfieffer Halls.  These buildings are being completely renovated including all new heating and cooling systems.  The installation of the piping will be buried underground approximately 3 feet deep which means there will be long three foot deep trenches during the school year.  For current areas of trenching and safety precautions please click here
 
Construction Start  November 2007  
Completion March 2008  

Electrode Boiler

100% Complete-Operational
Nebraska Boilers                               100% Complete-Operational
Chilled Water System 100% Complete-Operational
Steam to Hot Water System 100% Complete-Operational
 


Central Utility Plant
 
Project Overview
 
Energy Systems Group, LLC (ESG) was selected in December of 2006 to completely renovate the James B Shepherd Central Utility Plant to provide Clark Atlanta, Spelman and Morehouse with steam, hot water for heating and chilled water for cooling for the next 15 years.  ESG is building a state of the art central plant for maximum reliability and highest efficiency by installing two new high efficient boilers that utilize either natural gas or propane and one boiler using electricity.  This design gives your central utility plant to make steam from three different sources of fuel making it the most reliable and lowest cost to operate plant in the Southeast.  ESG is also expanding the use of the Central Utility Plant to provide chilled water for airconditioning and high temperature hot water for both heating and domestic hot water.  Other renovations include a facelift of the entire building with the installation of a new roof, cleaning of the existing windows and new paint throughout the building.  All these renovations in the Central Utility Plant is the foundation for modernizing  the Clark Atlanta University campus.

 
Current Construction Overview
Present
Completion
Demolition
Complete
Removal of Old Boiler 
Complete
Installation of New Chiller
Complete
Boiler Installation
Complete
 
Interior Plumbing
Complete
 
Environmental Removal
Complete
 
Interior and Exterior Finishes
65% 
July 2008
Propane Air System
90% 
July  2008
Total Completion
July 2008
 
Contact Information:
 
Energy Systems Group, LLC
4655 Rosebud Lane
Newburgh, IN 47630
812-471-5000

ESG@EnergySystemsGroup.com
www.energysystemsgroup.com

Atlanta Office:
101 Marietta Street, Suite 2825
Atlanta, GA 30303
(404) 541-2590 (office)
(404) 541-2599 (fax)