Building Updates Header

Building Updates

 

Among the major renovations completed by Energy Systems Group is the replacement of two inefficient 750 horsepower boilers with 10 smaller modulating boilers. The new system will allow GSU to heat targeted areas of the university rather than wasting energy and money activating the whole system. Energy Systems Group replaced lamps and light fixtures throughout the university, which has vastly improved efficiency through extended lamp lives and reduced energy consumption.

 

A Wing B Wing C Wing D Wing E Wing F Wing G Wing

  • A Wing
  • B Wing
  • C Wing
  • D Wing
  • E Wing
  • F Wing
  • G Wing