B Wing Updates

 

Engbretson Hall (Completed) - Existing non-dimming high watt halogen flood can fixtures will be retrofitted with a hard-wired CFL lamp and ballast kits. CFL lamps will be high watt plug in type with remote mounted electronic ballasts, sockets and new R40 glass lenses.

 

Performing Arts Center (Completed) - ESG shall provide demand control ventilation for AHUs S-61 and S-62. The demand control ventilation algorithm will be programmed into the operating sequence of the units. CO2 sensors will be installed to monitor the air quality in the space. The outside air will modulate accordingly to provide adequate air quality.

 

Performing Arts Lobbies (Completed) - Existing non-dimming high watt incandescent can fixtures will be retrofitted with a hard-wired CFL lamp and ballast kits. CFL lamps will be high watt plug in type with remote mounted electronic ballasts and new sockets.

 

Dance Hall (Completed) - Existing non-dimming high watt halogen flood can fixtures will be retrofitted with a hard-wired CFL lamp and ballast kits. CFL lamps will be high watt plug in type with remote mounted electronic ballasts, sockets and new R40 glass lenses.